Schneider LUCL05FU TeSys Ultra standard control unit: service and selection card
LUCL05FU is the complete designation for a Schneider Electric TeSys Ultra standard control unit. This page gives the verified identity and a practical handover checklist for LUCL05FU; the shared category image is illustrative, not a photograph of the exact LUCL05FU item.
Technical data to check
| Technical item | Verified value / selection note |
|---|---|
| Complete model | LUCL05FU |
| Product identity | TeSys Ultra standard control unit |
| Current setting | 1.25–5 A |
| Protection | Magnetic motor protection |
| Control supply | 110–240 V AC/DC |
Receiving inspection
First confirm that the delivered LUCL05FU matches the purchase order and installed equipment tag. Check physical condition, label readability and any accessory codes before LUCL05FU enters stock.
Fit decision
Match the power base and motor full-load current. Confirm the exact LUCL05FU nameplate, current manufacturer instructions and the project drawing before acceptance.
Installation and service record
Before fitting LUCL05FU, isolate the relevant circuit and identify every conductor or busbar connection. Preserve settings or program data where LUCL05FU participates in a programmable system. After installation, carry out a controlled functional test appropriate to LUCL05FU and record the result.
For a repeat order of LUCL05FU, keep the complete suffix, source document revision, equipment tag, accessories and any measured site limits together. This prevents a visually similar variant from being substituted for LUCL05FU without a technical review.
Related visual-code register
The following 5 unassigned designations have a similar visible LUCL pattern to LUCL05FU, so they are indexed on this representative page instead of receiving separate product pages. Their ratings and functions may differ from LUCL05FU; verify each full code independently.
Buyer handover checklist
Specify LUCL05FU in full on the enquiry, not an abbreviated family name. Ask the supplier to confirm the marking and provide the appropriate Schneider Electric documentation for LUCL05FU. Log any deviation from the required LUCL05FU configuration before dispatch and again at commissioning.