ABB ESB100-20N-06 (1SAE361111R0620): Installation Contactor For Controlled Loads Specification and Procurement Checklist

description:Technical identification and selection guidance for ABB ESB100-20N-06 (1SAE361111R0620), including verified family data, system compatibility and configuration checks....
BASIC INFO

Field-fit and commissioning guide for ESB100-20N-06 (1SAE361111R0620)

Use the complete ESB100-20N-06 (1SAE361111R0620) designation when requesting this installation contactor for controlled loads. The installation must be checked against the actual equipment marking, because a shared product family does not establish identical ratings, options or approvals.

Key technical data

Technical itemVerified value / selection note
Complete designationESB100-20N-06 (1SAE361111R0620)
Product familyESB100
Component roleinstallation contactor for controlled loads
Contacts2 NO for ESB100-20N-06
Rated AC-1 current100 A family designation; confirm duty
Control supply230 V AC/DC for -06 variant
Order code1SAE361111R0620
Final configurationConfirm exact nameplate, hardware revision and order options before purchase

This table identifies the published family facts for ESB100-20N-06 (1SAE361111R0620). Treat any unlisted option as a selection question, not as an implied specification for ESB100-20N-06 (1SAE361111R0620). Consult the current ABB data and the installed nameplate before release.

What the device does

The work assigned to ESB100-20N-06 (1SAE361111R0620) is specific: Switch the assigned building or industrial load from the panel control circuit. Record the controlled process, feeder or network point in which ESB100-20N-06 (1SAE361111R0620) operates.

Check the upstream source and the downstream load or signal as a complete path. For ESB100-20N-06 (1SAE361111R0620), an apparently matching connector or housing does not establish functional equivalence.

Match the ordered configuration

The most important purchase question for ESB100-20N-06 (1SAE361111R0620) is: Check pole arrangement, utilization category, coil voltage, enclosure heat and connected load; ESB100-40N is not the same contact arrangement. Record any missing suffix, revision, calibration or approval with the supplier.

Ask whether the offered ESB100-20N-06 (1SAE361111R0620) item includes the required terminals, accessories and documentation. Any suggested substitute needs a line-by-line comparison, not an assumption based on the family prefix.

Installation boundary

Before fitting ESB100-20N-06 (1SAE361111R0620), isolate the process or electrical system under the site procedure and check the drawing, connection, mounting and environmental limits.

Document the original terminals and settings for ESB100-20N-06 (1SAE361111R0620). Reapply only approved wiring and parameter changes; retain the previous unit identification for traceability.

Commissioning evidence

The practical acceptance check for ESB100-20N-06 (1SAE361111R0620) is: Test coil pickup and dropout, contact continuity and feedback interlocks with the circuit isolated appropriately. Capture actual readings, states or faults rather than reporting only that the device powered up.

Close the work order for ESB100-20N-06 (1SAE361111R0620) with the observed test result, final configuration and responsible reviewer. If a safety or protective function is involved, follow the site-specific validation procedure.

Other codes within this series

The following ESB100 designations are grouped on the ESB100-20N-06 (1SAE361111R0620) page to aid searches and enquiries. They may differ in rating, options, protocol or dimensions. Confirm each full designation before substitution.

  • ESB100-20N-06, 1SAE361111M0620
  • ESB100-40N-06 (1SAE661111R0640)

Enquiry details to send

Quote ESB100-20N-06 (1SAE361111R0620) exactly, then state the installed equipment, required quantity, delivery location and whether a new unit or an approved service spare is needed.

For ESB100-20N-06 (1SAE361111R0620), request the current datasheet, option confirmation and lead time. On receipt, compare the supplied marking to the approved enquiry and retain the commissioning notes with the equipment record.

 

 

Pre:ABB FMT450-A1C1A3D3Y0A1Y0YC2C4CMM5NCCR2T11 | Sensymaster Thermal Mass Gas Flowmeter Configuration and Field Checks Next:Selection Notes for ABB RPBA-01 | Profibus Drive Fieldbus Adapter and Site Fit