Application and fit of ABB YO-C XT5-XT6 F/P, 1SDA104934R1
The exact ABB YO-C XT5-XT6 F/P, 1SDA104934R1 designation is the starting point for this service decision. The item serves as XT5/XT6 permanent-service shunt opening release; a neighboring code may have different fit, duty or connection details.
Technical identity and selection data
| Technical item | Verified value / selection note |
|---|---|
| Complete designation | YO-C XT5-XT6 F/P, 1SDA104934R1 |
| Product family | ABB Tmax XT YO-C |
| Component role | XT5/XT6 permanent-service shunt opening release |
| Complete designation | YO-C XT5-XT6 F/P, 1SDA104934R1 |
| Device or service family | ABB Tmax XT YO-C |
| Release | YO-C opening release |
| Breaker | XT5 / XT6 fixed or plug-in installation |
| Control | 110–240 V AC or 110–250 V DC in ABB article specification |
| Final configuration | Confirm exact nameplate, hardware revision and order options before purchase |
Use the ABB YO-C XT5-XT6 F/P, 1SDA104934R1 data as a verified starting specification, then check the delivered label and the cited manufacturer reference for option-dependent limits.
Evidence before ordering
Copy ABB YO-C XT5-XT6 F/P, 1SDA104934R1 from the installed part or an approved bill of materials, including punctuation, option letters and article code. Keep a label photograph with the enquiry.
For ABB YO-C XT5-XT6 F/P, 1SDA104934R1, resolve XT frame, installation form, control voltage and connection kit. Verify mechanical size, terminal style, supply or control rating and revision before accepting a substitute.
What this part does
In the identified installation, ABB YO-C XT5-XT6 F/P, 1SDA104934R1 is selected to provide an engineered opening path for the specified XT breaker. The asset drawing should show the exact connection or service position; appearance is not enough to establish its function.
Ask the maintainer why ABB YO-C XT5-XT6 F/P, 1SDA104934R1 is being changed: planned overhaul, failed diagnostic, retrofit or a damaged connection. That reason sets the acceptance test and required accompanying parts.
Receiving inspection
When ABB YO-C XT5-XT6 F/P, 1SDA104934R1 arrives, compare the full marking with the purchase order. Inspect the connector, case, terminals and packaging before the existing component is removed.
Check whether ABB YO-C XT5-XT6 F/P, 1SDA104934R1 is a single component, a maintenance kit or an assembly. Record included accessories and any missing pieces before the maintenance window begins.
Compatibility boundary
ABB YO-C XT5-XT6 F/P, 1SDA104934R1 should be compared with the exact host equipment, not only the broad ABB Tmax XT YO-C name. Confirm the host serial number, option package and engineering drawing.
A seller's equivalent for ABB YO-C XT5-XT6 F/P, 1SDA104934R1 needs explicit engineering approval. Similar labels can conceal different contacts, pitch, voltage, software support, mechanical travel or service scope.
Safe installation route
Work on ABB YO-C XT5-XT6 F/P, 1SDA104934R1 only under the site's isolation, stored-energy and permit procedure. For breaker and drive parts, the equipment-specific safety manual controls the job.
Mark the existing ABB YO-C XT5-XT6 F/P, 1SDA104934R1 connections and fitted orientation. Retain parameters or adjustment records where applicable, and keep removed parts for comparison until function is proved.
Functional acceptance
After fitting ABB YO-C XT5-XT6 F/P, 1SDA104934R1, test opening command and permitted reset sequence. Observe the intended operating states and the alarm or diagnostic path using an approved test method.
If ABB YO-C XT5-XT6 F/P, 1SDA104934R1 affects a protection or safety function, demonstrate the permitted fault response as well as normal operation. Record measurements, configuration and witness approval.
Handover to procurement and maintenance
The ABB YO-C XT5-XT6 F/P, 1SDA104934R1 order should state the full designation, quantity, host asset and required delivery condition. Do not shorten it to a family name in a repeat purchase.
Keep the ABB YO-C XT5-XT6 F/P, 1SDA104934R1 label image, manufacturer reference, fitted revision and test result together. That file is the basis for future replacement decisions.
Final release check
Before release, match the installed ABB YO-C XT5-XT6 F/P, 1SDA104934R1 label to the order and sign off its functional test.
Retain the ABB YO-C XT5-XT6 F/P, 1SDA104934R1 comparison and acceptance record for the next service interval.