ABB A95-30-00-85 application questions and verified data
Use the ABB A95-30-00-85 identification below as the initial technical checkpoint for a real installation. Any incomplete suffix or coil notation must be resolved against the delivered label.
Key technical data
| Technical item | Verified value / selection note |
|---|---|
| Complete designation | A95-30-00-85 |
| Product family | A95-30 |
| Component role | three-pole AC contactor |
| Exact type | A95-30-00-85 |
| ABB order reference | 1SFL431001R8500 |
| Main poles | 3 |
| Built-in auxiliaries | 00 designation; specify required blocks |
| Coil | Check -85 coil against ABB label |
| Final configuration | Confirm exact nameplate, hardware revision and order options before purchase |
The ABB A95-30-00-85 values describe the cited catalog reference. Verify nameplate details and plant conditions before treating them as acceptance limits.
What work is assigned to this part?
ABB A95-30-00-85 is requested to switch a correctly rated power circuit. Define the specific motor, circuit or controller tag and the event that prompted the replacement.
Keep the ABB A95-30-00-85 request bounded to the component and its documented accessories. A change to control logic or protection settings is a separate engineering decision.
What must be preserved during replacement?
Before ABB A95-30-00-85 is removed, retain cable identification, setting files, drawings and a baseline of normal indications. Follow the plant's energy-isolation procedure.
Fit ABB A95-30-00-85 with the specified clearances, grounding, terminals and protective devices. Do not modify other equipment merely to accommodate a different variant.
Which inputs determine the correct order?
For ABB A95-30-00-85, confirm AC-3 or AC-1 duty, coil code, busbar clearance and auxiliary needs. Photograph the installed label and terminals before any disconnection.
The exact ABB A95-30-00-85 designation matters: coil code, pole arrangement, enclosure, processor revision or protocol may change despite a similar appearance.
How do ratings become a site decision?
Compare the ABB A95-30-00-85 verified values in the table with the real supply, load, environment and installation. A catalog capability only applies under its stated conditions.
If ABB A95-30-00-85 lacks a verified option or rating for this plant, obtain ABB documentation or written engineering approval before ordering.
Which checks prove the installation?
After approved installation of ABB A95-30-00-85, confirm all poles and fitted auxiliary blocks. Include connected interlocks and all states that the process owner requires.
Record the ABB A95-30-00-85 serial or revision, test conditions, observed results and witness. Return the plant to normal only after sign-off.
How should purchasing treat an alternative?
For ABB A95-30-00-85, the RFQ should include the complete model, approved article number where available and the equipment label. State required accessories separately.
A proposed substitute for ABB A95-30-00-85 needs a comparison of ratings, fit, approvals, control interface and commissioning effort before acceptance.
Same-series models to discuss with the supplier
The following A95-30 references are grouped with ABB A95-30-00-85. They are not automatically interchangeable; compare each full code and its electrical, mechanical or software options.
- A95-30-11-84
- A95-30-22-88
Final handover
Keep the ABB A95-30-00-85 selection evidence, ordered code, installed label and test report together with the equipment record.
Where ABB A95-30-00-85 is part of a safety or production-critical circuit, retain the approved rollback plan and operating authorization.