Where ABB 1SDA054972R1 belongs in the switch assembly
ABB 1SDA054972R1 belongs to PB200 high phase barriers and is identified as PB200 three-pole high phase-division barrier. The shared category image is a reference only; it does not certify the exact appearance of ABB 1SDA054972R1.
The technical table captures verified ABB 1SDA054972R1 identification and the checks that determine whether the article fits a particular switchboard or machine.
Technical data and interface checks
| Technical item | Verified value / selection note |
|---|---|
| Complete designation | 1SDA054972R1 |
| Product family | PB200 high phase barriers |
| Component role | PB200 three-pole high phase-division barrier |
| Exact ABB order reference | 1SDA054972R1 |
| ABB product series | PB200 high phase barriers |
| ABB description | PB200 T4-5-7-T7M-X1 3p PART.DIV.PHA.HIGH |
| Function | High phase-partition barrier |
| Poles | Three for representative article |
| Related variant | Four-pole PB200 uses a different code |
| Final configuration | Confirm exact nameplate, hardware revision and order options before purchase |
Equipment boundary
ABB 1SDA054972R1 is specified for PB200 high phase barriers. Its intended use is to maintain the specified separation between phases. Identify the host assembly and duty before selecting this exact article.
A matching visual outline is not enough for ABB 1SDA054972R1. Compare the manufacturer's order code, variant, host series and installation drawings.
Connection and physical fit
Check breaker frame, pole number and terminal clearance for ABB 1SDA054972R1. Include the connection side, panel depth, terminal design and any control wiring in the review.
If another variant is proposed in place of ABB 1SDA054972R1, request a comparison of the changed dimensions, electrical limits, included pieces and approval conditions.
Operational sequence
Map the state or function ABB 1SDA054972R1 must provide within the complete switch or breaker arrangement. Identify the expected normal, maintenance and fault positions.
Commission ABB 1SDA054972R1 only after checking adjacent mechanisms and interlocks. A part can fit mechanically yet create an unsafe operating sequence.
Receiving and identification
On receipt of ABB 1SDA054972R1, compare the package label and manufacturer marking with the approved purchase line. Inspect covers, connectors, contacts and included hardware.
Quarantine ABB 1SDA054972R1 if the code, revision or condition differs. Keep photos and supplier clarification in the maintenance record before installation.
Safe installation
Isolate all relevant supplies before working around ABB 1SDA054972R1; follow ABB and site procedures for stored energy, test points and lockout. Record the existing part orientation and wiring.
Mount ABB 1SDA054972R1 with the specified fixing hardware. Recheck phase clearance, earth continuity, cable routing, torque and protective cover position as applicable.
Functional acceptance
After installing ABB 1SDA054972R1, inspect full barrier seating. Use an approved test plan and record both positive operation and inhibited or fault states.
Retain the ABB 1SDA054972R1 as-left code, host identity, measurements and authorizing sign-off. Do not treat packaging acceptance as a substitute for site testing.
Spare-parts handover
Register ABB 1SDA054972R1 with its complete article number and compatible equipment. Keep any size, pole, voltage or controller restrictions beside the stock record.
For future ABB 1SDA054972R1 enquiries, pass on the installed-system drawing and approved selection evidence so buyers do not substitute a different variant by name alone.
Other articles in this ABB series
The following ABB codes are represented on the ABB 1SDA054972R1 page rather than published as separate product pages. They may differ in frame, pole count, length, electrical rating or supplied contents; none is an automatic substitute.
- 1SDA054973R1
Order and acceptance record
State ABB 1SDA054972R1 in full, plus quantity, host equipment and the required operating or installation limits.
File the ABB 1SDA054972R1 delivery identity and commissioning result with the equipment history.