ABB 1SBL411001R8800 — three-pole A75 AC-coil contactor Selection Record

description:Technical identification and selection guidance for ABB 1SBL411001R8800, including verified family data, system compatibility and configuration checks....
BASIC INFO

ABB 1SBL411001R8800 switching-path review

Use this switching-path record to decide whether ABB 1SBL411001R8800 matches the intended control circuit and mechanical assembly.

Verified technical data

Technical itemVerified value / selection note
Complete designation1SBL411001R8800
Product familyA75-30-00
Component rolethree-pole A75 AC-coil contactor
Exact ABB order code1SBL411001R8800
Product seriesA75-30-00
Main poles3
AuxiliaryNone in -00 layout
Coil230–240 V 50 Hz / 240–260 V 60 Hz
Final configurationConfirm exact nameplate, hardware revision and order options before purchase

The ABB 1SBL411001R8800 parameters above come from the cited ABB source. Verify any option-dependent value on the delivered unit before energizing it.

1. Confirm the ordering identity

Record the complete ABB 1SBL411001R8800 code from the marking, quotation and approved drawing. An ABB series name alone cannot establish the supplied coil or contact arrangement.

Treat ABB 1SBL411001R8800 as the precise purchasing identity, including suffixes. A product photograph is a reference, not proof of the exact delivered configuration.

3. Match the actuator supply

Compare the ABB 1SBL411001R8800 control-coil code to measured supply voltage, frequency or DC source. Distinct coil suffixes within a family are not plug-in equivalents by assumption.

For ABB 1SBL411001R8800, check AC supply, current and overload coordination; preserve a record of the verified coil marking and control-source rating.

2. Draw the current and signal paths

Map the conductors that ABB 1SBL411001R8800 will switch and the indication path returning to the controller. The intended job is to switch an A75-class three-phase load.

Before installing ABB 1SBL411001R8800, check the real load, utilization category, contact plan and any required protective device in the full circuit.

5. Commission the entire assembly

After safe isolation and installation by qualified personnel, prove all main poles. Check normal operation, release and relevant failure indication.

An ABB 1SBL411001R8800 acceptance record should include the commanded sequence, contact-state observations and the protective-system result.

4. Test mechanical and accessory fit

Verify ABB 1SBL411001R8800 dimensions, mounting, terminal access, interlocks and accessory-block fit against the panel drawing and manufacturer instructions.

Check the enclosure clearances for ABB 1SBL411001R8800, not only the face dimensions. Specify optional auxiliary blocks separately where the control design needs them.

6. Decide on substitutions explicitly

If ABB 1SBL411001R8800 is unavailable, compare the suggested alternative's coil, main poles, auxiliary contacts, duty, approvals, mounting and wiring one field at a time.

Do not mark another code as an automatic replacement for ABB 1SBL411001R8800; secure engineering approval and keep the differences with the equipment record.

Release criterion

Release ABB 1SBL411001R8800 for purchase only after the full code, duty, coil and terminal layout agree with the approved design.

File the ABB 1SBL411001R8800 commissioning result, source reference and as-left drawing together for future maintenance.

 

 